How to choose a renovation contractor in Malaysia (2026)
Get at least three itemised quotes for the same scope, check that the contractor is registered with the Construction Industry Development Board (CIDB), and sign a written contract with a payment schedule linked to completed work. Prices are usually quoted per item or per square foot. Ask about approvals from your management body or local council, and agree a defects period before work starts.
Last updated 31 October 2026 · See the Top 10 renovation contractors in Malaysia →
Typical costs in Malaysia (2026)
| Item | Typical range / basis |
|---|---|
| Kitchen cabinets | Roughly RM800–RM2,000 per foot run |
| Floor tiling (supply and lay) | Roughly RM8–RM25 per sq ft |
| Full repaint (3-bedroom) | Roughly RM3,000–RM8,000 |
| Bathroom refurbishment | Roughly RM8,000–RM25,000 per bathroom |
| Wiring and plumbing | Quoted per point |
Editorial estimates from published rate cards and quotes. Always get written quotes.
Licence or registration to check
Contractors should be registered with CIDB under the CIDB Act 1994. Electrical work should be done by a contractor registered with the Energy Commission.
Checklist before you hire
- Check CIDB registration and grade
- Get itemised quotes for the same scope
- Sign a contract with a schedule and defects period
- Link payments to completed stages
- Confirm approvals from management or council
- Ask for proof of insurance
Questions to ask
- Who will be on site and who supervises?
- How do you price variations?
- What is the start date and completion date?
- Do you handle permits and management approval?
- What defects period do you offer?
Red flags
- Asking for most of the payment upfront
- No CIDB registration
- Verbal agreements only
- Vague lump-sum quotes without items
Top-ranked renovation contractors right now
- Sri Kim Construction — Ampang, category score 99
- DeReno — Cheras, category score 90
- LL Redefine Renovation & Design — Petaling Jaya, category score 90
FAQ
How much deposit is normal?
Deposits are commonly 10%–30%, with the rest paid by stages.
Do I need a permit?
Structural, extension or façade works usually need local council approval.
What if work is defective?
Report defects in writing within the defects period. Consumer claims tribunals may help for smaller amounts.